The Northen end of Trench 01 is this small 3.00m x 4.00m area that clips wall [M006]. The aim here was to see if the wall extends further south, and eventually excavate its foundations to establish a construction date.
Currently the demolition rubble has been exposed, which now needs to be removed.
This model was created by our third-year student Matt Lawrence, with some guided student lead teaching from second-year student Ben Watson and the Specialist Teaching Technician Alex Birkett.
[HARP_2022_Q_05.01.LQ]